SHITANOE SHIPBUILDING CO.,LTD

施設設備

Shitanoe Shipbuilding’s Main Facilities

  • The Dock: Breadth 30m,Length 165m,Depth 7m
  • Rest Facility
  • 60ton Traveling Crane
  • 150ton Traveling Crane
  • No.1 NC Machine
  • No.2 NC Machine
  • The 3rd Assembling Factory
  • The 7th Assembling Factory

No.1 Building Dock

Erected in September, 2003 and Extended 30m in January, 2007

NC Machine

Erected in February, 1993

60ton Traveling Crane

Erected in June, 1994

150ton Traveling Crane

Erected in May, 2006

Head Office

Erected in April, 2006

Design

Design Room

  • inquiry
  • privacy_policy

SHITANOE SHIPBUILDING CO.,LTD 1200 Oaza Shitanoe Usuki City Oita prefecture 875-0002
TEL:0972-67-2216 FAX:0972-67-2465
Copyright © 2008.SHITANOE SHIPBUILDING CO.,LTD